Skip to the page
Guides

Reading a transport tender, page by page

By Journey Mark Ltd · Updated · 6 min read

A first transport tender is a bundle of documents that can run to a hundred pages. Many small operators fail not because they cannot do the work, but because they misread what was asked. This guide is for operators who are about to open a council tender for school or adult social care transport. By the end you will know what each part of the pack is for, what to look for in it, how marks are usually given, and how to plan the days before the deadline.

Procurement rules change, and every council has its own style. Read the current guidance on gov.uk, and treat the instructions in your own pack as the final word.

Start with the covering letter or invitation

The first document is usually an invitation to tender, or a set of instructions to bidders. Read it before anything else, and twice. It tells you:

  • what is being bought and for how long
  • the deadline, to the minute, and how to submit
  • the portal you must use, and whether you need to register
  • the deadline for questions and how they are answered
  • how bids will be evaluated, and by whom
  • what must be returned, in what format and in what order

A bid that arrives a minute late, or on the wrong portal, or without a required form, can be thrown out without being read. Put the deadline in your diary and plan to submit a day early.

The specification

The specification describes the service the council wants. It is the most important document. Look for:

  • the type of work: home-to-school, post-16, adult day services, hospital discharge
  • the routes or journeys, with pick-up areas, schools, times and the number of children or adults
  • the vehicle types and the number of wheelchair spaces
  • the need for passenger attendants, and how many
  • the standards for crew: licences, DBS, training
  • reporting and record-keeping duties
  • what happens on a late run, a no-show or an incident
  • the start date, the length of the contract and any extension options

Read the routes with a map open. A route that looks short on paper can be long in traffic. Count how many vehicles and crew you would need at the same time. If two routes run at the same hour, you need two vehicles and two crews.

Lots

A council often splits the work into lots, groups of routes or areas that you can bid for separately. A lot might be a set of routes to one school, a postcode area, or a type of service such as wheelchair routes.

Check:

  • whether you can bid for one lot, several, or only all
  • whether there is a limit on how many lots one supplier can win
  • how the lots are scored, and whether bidding on several affects the result

A small operator often does well by bidding for a lot that suits its vehicles and location, not by trying for everything. A lot you cannot staff, however cheap, will cost you.

The pricing schedule

The pricing schedule is a form you fill in, usually a spreadsheet. It is where mistakes happen.

  • Fill in every cell that is asked for, in the format asked for: per run, per mile, per day, per hour.
  • Check what the price includes. Does it include the passenger attendant, waiting time, fuel, the empty miles? The pack will say.
  • Do not change the form, add columns or add notes to a cell unless instructed. Councils use the form to compare bids, and a changed form may be rejected.
  • Check your sums. A wrong total, a missing route or a figure typed into the wrong row is a very common reason for a bid to fail.
  • Work out what each price means for your costs before you submit. See our guide on pricing a school route.

Notice whether prices are fixed for the contract, or can be reviewed, and whether there is a maximum the council will pay. A price above a stated ceiling may be excluded.

The quality questions

Alongside price, the council asks questions about how you will do the work. They are called quality or method statement questions. Typical topics are:

  • safeguarding and recruitment
  • crew training and supervision
  • how you will manage the vehicles and keep them safe
  • your plan for starting the contract
  • contingency, such as breakdowns and sickness
  • communication with parents, schools and the council
  • data protection
  • social value, such as local jobs and the environment

Each question has a word or page limit, and a score. Note the limit, and keep to it. Answers over the limit are often cut off and not read past it. Our guide on writing good tender answers covers how to answer them.

The weights

Most tenders say how marks are shared between price and quality, such as sixty per cent for quality and forty for price. The split tells you how the council thinks. A high price weight means you must be competitive. A high quality weight means a strong written answer can beat a cheaper bid.

Look also at the weights within quality. If safeguarding is worth twenty per cent and social value five, spend your effort accordingly. And check for pass or fail questions, where a poor answer, or a missing policy, removes you from the competition whatever your other scores. Typical examples are insurance levels, licences and equal opportunities policies.

Terms and conditions, and TUPE

The contract terms matter even though they come last. Read the sections on:

  • payment terms and when invoices are due
  • what happens when a run is cancelled
  • price reviews and indexation
  • liability and insurance levels
  • termination, by you and by the council
  • performance measures and any deductions for failures
  • how variations are agreed

TUPE stands for Transfer of Undertakings (Protection of Employment). Where a service moves from one supplier to another, staff who work on it may have a right to transfer to the new supplier on their existing terms. A tender for an existing service often includes a list of staff, with their pay and hours, and you must allow for the cost in your price. Ask whether it applies, and take advice if it does. Getting it wrong can be costly.

Clarification questions

If something is unclear, ask. Councils set a deadline for questions and usually share the answers with all bidders, without saying who asked. A good question quotes the page and asks a single thing: "Section 3.2 says wheelchair routes need two passenger attendants. Does this apply to the routes in lot 2?"

Do not ask for information that is in the pack, and do not leave questions to the last day. The answers may change your price.

Plan your days

Work backward from the deadline.

  1. Read everything in a single sitting and make a list of every document, form and policy you must return.
  2. Decide whether to bid. Can you staff and equip the routes? Is the price workable? Saying no is a legitimate answer.
  3. Send clarification questions early.
  4. Gather the policies, licences, insurance certificates and references. Check each is current.
  5. Draft quality answers first, then price.
  6. Have somebody else read the whole bid against the instructions, with a checklist.
  7. Submit a day early, and confirm receipt.

The free London tenders list shows what is open, and our council tenders and contracts guide gives the wider picture. Contracts Finder and Find a Tender, linked below, are the official public notice sites.

This is guidance, not legal advice.

Sources

Run your contracts on Journeymark