Skip to the page
Guides

Winning council work: portals, reverse auctions and keeping what you win

By Journey Mark Ltd · Updated · 8 min read

Many councils now buy school transport routes in a way that rewards preparation as much as price. The routes are put out on an online portal, operators quote against each other, and the work goes to whoever quotes best before the clock runs out. This guide is for operators who already know the basics of tendering and want to win more routes. It describes how the portals and reverse auctions work in practice, how to prepare a team to quote, what to do about low quotes, why you should never give work back, and why a second pair of eyes is worth having.

It is written from our experience of running transport companies. Each council has its own rules and they change, so read the instructions for every system you use.

The portals

Many councils run their passenger transport dynamic purchasing systems on commissioning portals, such as Adam (adamproviders.co.uk) and SProc.Net. A provider registers once, is approved to the system, and then sees the routes the council puts out. Our guide to dynamic purchasing systems and frameworks explains the basic idea.

What matters in practice is that a portal runs on time and on rules. Routes appear with a closing time. Quotes are entered through the portal, not by email. You can only quote on what you can see, and what you can see depends on your approval and on the categories you hold. A provider who has not read the portal's guide, or who has an out-of-date profile, can lose the route before the price is even considered.

Read each council's instructions for its portal, and keep your company profile, insurance documents and policies current there.

How a reverse auction works

In an ordinary auction, the price goes up and the highest bidder wins. In a reverse auction, the price goes down. The council puts a route out, and the providers quote, each trying to undercut the others, until the closing time. The lowest quote, or the best quote on a combination of price and quality, wins.

In our experience, some councils, Merton among them, put out almost all of their work at the same time. That can mean 8 o'clock in the morning, one day, with 60 routes to quote at once. The more people you have logged in and quoting up to that time, the more likely you are to win work. Sometimes batches close every hour, and sometimes the routes are open over a few days, if you are lucky. When a lot is open at one time, the operator with ten people quoting will see more routes and react faster than the operator with one or two.

Rules differ between councils and from year to year. Some auctions show you where you stand, some do not, and some have a minimum step. Read the rules, and practise with the portal before the real event if the council allows a trial.

Prepare a price sheet for each quoter

Quoting in the last minutes of an auction is fast and stressful, and people make mistakes under pressure. The answer is to decide the prices in advance.

Prepare a spreadsheet for every person who will quote, and give it out before the day. For each route, or each type of route, it should show:

  • the price you will start at
  • the middle price you will move to if the route is still open
  • the lowest price, the floor you will not go below

Each quoter works towards those numbers as time runs out. Do not leave the decision to the individual on the day, and do not let anyone quote below the floor.

Work out the numbers from your real costs, as set out in pricing a school route, including crew pay, vehicle cost, waiting time and margin. If you do not have a crew for a route at the lowest price, do not quote it.

Keep each person to a limited number of quotes as time runs out, at most three or four. A person who tries to quote on ten routes in the last minute will make errors, miss the closing time or enter a price in the wrong box. It is better to have more people, each with fewer routes.

Recruit and train quoters

If there is a lot of work at one time, it is best to have as much staff as you can. You can recruit people for that one purpose, bring them in and set them up in your office. Because the portal is online, they can in fact log in from anywhere.

A few points on doing it properly.

  • Train them. Take them through the portal, the sheet and the rules. Practise on past routes, or in a trial, so that it is not their first time on the day.
  • Choose people you trust. Prefer people who have had some experience quoting, and who understand that a price is a promise you must keep.
  • Give each person their own login. Where the council's portal allows it, add each person who quotes as their own user on your company's portal account. Never share one password between several people. Shared passwords are against the terms of many systems, you cannot tell who did what, and one leaked password exposes the whole account. If the portal does not allow extra users, ask the council what it does allow, and do not work around the rule.
  • Set them up with the same prices. Everyone should be working from the same sheet and the same floor.
  • Brief them afterwards. Ask what worked and what did not. They will see things you did not.

An operator with many trained quoters is in a very different position from one with only one or two people logged in.

Learn from a low quote, but never give the work back

Sooner or later you will win a route at a price that was too low. It happens to everyone in a fast auction. The temptation is to hand the route back to the council. Do not.

If you quote low, keep the work for the year. That is a hit your company has to take. Treat it as the cost of learning, and make sure you do not quote that low again.

Giving work back looks very bad. A council that has awarded a route expects it to be run. If an operator hands it back, especially if the reason is that it overpriced, the transport team has to find another provider in a hurry, a child's journey is put at risk and the officer remembers your name. It affects the references you can ask for and the routes you may be offered. Operators who build their business on reliable service cannot afford that reputation.

After the year, review. Where did you go too low, and why? Where were your crew costs different from what you assumed? Use that to set a better floor.

Know your limits and your crew prices

To avoid quoting too low, you need to know what you can and cannot find for crew prices in the areas you are looking at. Crew prices change. Sometimes they go down because more crews are available in a certain area. Sometimes you are linked through a person who knows a lot of crews who can work for a smaller margin, which lets you go down to lower prices.

Keep a simple record of what you pay crews in each area, and update it. Ask the people you work with where costs are rising or falling. A floor based on last year's crew prices may be wrong this year.

Quoting low is acceptable, as long as you know why you are doing it. A lower price on a route that strengthens your position in an area, or fills a gap in your day, may be worth it. But do not make it a habit. If every route is a loss, you are not building a business, you are funding the council's transport budget.

A fresh pair of eyes

Before any tender application goes off, get somebody else to review it. It is always good to have a fresh pair of eyes on it. A second reader finds the question you did not answer, the form you did not fill in, the price in the wrong row and the policy that is out of date. Our guide to reading a transport tender lists the usual traps, and writing good tender answers shows what a strong answer looks like.

Ask the reviewer to read it as the council's evaluator would: with the question in one hand and the answer in the other, ticking off each part.

Different councils work in different ways, and what works for one may not work for another. Merton's habit of releasing nearly all its work at once is an example. Others spread work through the year, or use quality questions more than price. Keep a short note for each council you work with: how it releases work, what it likes in an answer, who the contact is and what went wrong last time. It builds up into real advantage.

Journeymark can help once you have won the work, because it keeps bookings, messages and papers in one place, so the office can see each new route, its crew and its papers together. But the winning is done on the portal, and it is done by preparation.

Summary

  • Learn each portal and keep your profile current.
  • In a reverse auction, have more trained people quoting than your competitors.
  • Prepare a price sheet with a start, a middle and a lowest price.
  • Limit each person to three or four quotes as time runs out.
  • Give each quoter their own login. Never share a password.
  • If you quote too low, keep the work for the year, and learn.
  • Never give work back.
  • Have someone else read every tender before it goes.

This is guidance, not legal advice.

Sources

Run your contracts on Journeymark